GREENOUGH HARBOUR REID'S HERITAGE HOMES
 






  FOREST LOTS - LAKEWOOD COUNTRY LANE
LOT# ACREAGE PRICE
1 1.77
2 1.63
3 1.61
4 1.56
5 1.60
6 1.62
7 2.00
8 1.64
9 1.67
10 2.26
11 1.93
12 1.68
13 1.53
14 1.48
15 1.56
37 1.5
38 1.74
39 1.74
40 2.18
41 1.45 $25,970
42 1.68
43 1.79 $31,140
44 2.25
45 1.86
46 1.65
47 1.74
48 1.92
  FOREST LOTS - TRILLIUM CROSSING
LOT# ACREAGE PRICE
TC1 2.36
TC2 2.01 $32,300
TC3 1.72 $32,300
TC4 1.81
TC5 1.63 $32,300
TC6 1.48 $32,300
TC7 1.74 $32,300
TC8 1.66 $32,300
TC9 1.66
TC10 1.57
TC11 1.53 $32,300
TC12 1.69 $32,300
TC13 1.55 $32,300
TC14
1.53
$32,300
TC15
1.70
$32,300
TC16
1.66
$32,300
TC17
1.69
$32,300
TC18
1.61
$32,300
TC19
1.49
$32,300
TC20
1.49
$32,300
TC21
1.41
$32,300
TC22
1.57
$32,300
  WATERFRONT LOTS ALL SOLD
LOT# ACREAGE PRICE
n/a n/a





 
 
HOME SQ. FT. PRICE
Appleona 1,562 sq. ft. $232,788
Arcona 1,680 sq. ft. $229,658
Chicora 1,335 sq. ft. $197,420
Coburn 1,325 sq. ft. $203,217
Griffin 1,610 sq. ft. $228,040
Magnetawan 1,444 sq. ft. $206,981
Saganaw 1,202 sq. ft. $198,532
Aberdeen 1,280 sq. ft. $197,420
Andover 1,539 sq. ft. $232,788






 
HOME SQ. FT. SITE SERVICE FEES
Appleona 1,562 sq. ft. $38,000
Arcona 1,680 sq. ft. $38,000
Chicora 1,335 sq. ft. $38,000
Coburn 1,325 sq. ft. $38,000
Griffin 1,610 sq. ft. $38,000
Magnetawan 1,444 sq. ft. $38,000
Saganaw 1,202 sq. ft. $38,000
Aberdeen 1,280 sq. ft. $38,000
Andover 1,539 sq. ft. $38,000

 

SITE PREPERATION AND SERVICES

Surveyor As per Registered Plan 3M-165
  Sewer Septic system
* Lots 1-48 on communal sewer system
  Well Depth 160 ft. with 60 ft. of casing
  Underground Hydro 200 ft. from road to house
  Telephone Line Underground 200 ft.
  Driveway* 200 ft.
  Tree Cleaning 200 ft. driveway
60 X 80 ft. house site
40 X 40 ft. septic area

Price Includes
Std. Lakewood Specifications

Price Excludes
Land Price
GST (Purchaser to claim any eligible rebate)
Lot Premiums
Appliances
Paved Driveways
Garage
The price for site preparation and services include the following:
All necessary site services and preparation for the construction of the house.
Including,Tree clearing, removal of stumps and soil, gravel on driveway and house site, hydro and telephone underground, backfill around house 2.5 ft. above footing,
Septic system installed and well drilled. (additional charges will apply for wells depths over 160ft)

*Note: Driveway will be shared for the first 50 ft. to 200 ft., white gravel on top layer, (on shared driveway only) Includes all labour, materials and machinery required to complete job.



(Prices subject to change without notice)